GBUG Guildford Bike User Group https://www.g-bug.org Making Guildford Safe For Cycling Thu, 21 Nov 2024 23:03:23 +0000 en-GB hourly 1 https://wordpress.org/?v=6.7.1 https://www.g-bug.org/wp-content/uploads/2020/10/cropped-Logo-for-website-2-2-32x32.jpg GBUG Guildford Bike User Group https://www.g-bug.org 32 32 GBUG are delighted that the council will re-consider their decision on the London Road Active Travel scheme https://www.g-bug.org/gbug-are-delighted-that-the-council-will-re-consider-their-decision-on-the-london-road-active-travel-scheme/?utm_source=rss&utm_medium=rss&utm_campaign=gbug-are-delighted-that-the-council-will-re-consider-their-decision-on-the-london-road-active-travel-scheme https://www.g-bug.org/gbug-are-delighted-that-the-council-will-re-consider-their-decision-on-the-london-road-active-travel-scheme/#comments Tue, 19 Nov 2024 22:33:03 +0000 https://www.g-bug.org/?p=2604 GBUG along with others, called in Surrey County Council’s decision not to go ahead with the London Road Active Travel scheme as we believed the decision was not based on the evidence. For example, many objections to the scheme were given due to the design of floating bus stops, however these were removed from the…

The post GBUG are delighted that the council will re-consider their decision on the London Road Active Travel scheme first appeared on GBUG Guildford Bike User Group.

]]>
GBUG along with others, called in Surrey County Council’s decision not to go ahead with the London Road Active Travel scheme as we believed the decision was not based on the evidence. For example, many objections to the scheme were given due to the design of floating bus stops, however these were removed from the scheme in 2023.

We were delighted to hear that the council will re-consider their decision on 26th November 2024.

Existing provision along London Road is intimidating for many vulnerable users

There was no reasoning to suggest how the council weighed up all of the available evidence relating to safety of the new scheme for all residents when compared to the current arrangement.

GBUG also wrote to the Surrey County Council Cabinet members with the following:

Safety

  • the design for the scheme is far safer than the current road and footpath arrangement.
  • the scheme will be significantly safer than the current arrangement for vulnerable residents and residents with disabilities. The no. of controlled pedestrian crossings will increase from 2 to 7, kerb radii are being tightened to slow down vehicles turning into side roads, and tactile paving will be added to all side roads.

Bus stops

  • floating bus stops were removed from the scheme in 2023 yet a large amount of evidence discussed at the meeting was around floating bus stops.
  • the scheme has changed so that there are shared pedestrian/cycle paths by the bus stops, which is the same as the current arrangement for the bus stop outside the shops.

Road and footpath widths

  • most of the shared usage path would be 3 metres wide. The narrowest 5% of the route would be 1.8 metres – but this is still wider than the current path which we have measured in places as being 1.75m Northbound and 1.35m Southbound.
  • the road under the proposed scheme would be a minimum of 6.5 metres wide at all points, which is wide enough for two HGVs to safely pass without needing to move to the sides of the road.

Independent parties

  • ARUP (an engineering consultancy) provided an independent report that the scheme was safe, and an improvement on the current arrangement.
  • Active Travel (the experts in these schemes) have funded the scheme and signed it off as being safe.

Council commitments

  • the council also has commitments to Net Zero, The local Transport Plan and Vision Zero.

Residents’ voice

  • 50% of residents voted for the scheme, and only 30% against.
  • the scheme is supported by George Potter, County Councillor for Guildford East, and Matt Furness the expert member of the cabinet, and that the only cabinet member who has lived in the local area also voted in favour of the scheme.

The post GBUG are delighted that the council will re-consider their decision on the London Road Active Travel scheme first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/gbug-are-delighted-that-the-council-will-re-consider-their-decision-on-the-london-road-active-travel-scheme/feed/ 2
GBUG is being consulted on the Guildford to Godalming Greenway crossings https://www.g-bug.org/gbug-is-being-consulted-on-the-guildford-to-godalming-greenway-crossings/?utm_source=rss&utm_medium=rss&utm_campaign=gbug-is-being-consulted-on-the-guildford-to-godalming-greenway-crossings https://www.g-bug.org/gbug-is-being-consulted-on-the-guildford-to-godalming-greenway-crossings/#respond Thu, 14 Nov 2024 21:42:01 +0000 https://www.g-bug.org/?p=2586 GBUG is being consulted as a stakeholder on the proposed signalised crossings and raised tables on the Guildford to Godalming Greenway. Have your say here before 13th December 2024, or email us on info@g-bug.org with comments you think we should be considering.

The post GBUG is being consulted on the Guildford to Godalming Greenway crossings first appeared on GBUG Guildford Bike User Group.

]]>
GBUG is being consulted as a stakeholder on the proposed signalised crossings and raised tables on the Guildford to Godalming Greenway. Have your say here before 13th December 2024, or email us on info@g-bug.org with comments you think we should be considering.

The post GBUG is being consulted on the Guildford to Godalming Greenway crossings first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/gbug-is-being-consulted-on-the-guildford-to-godalming-greenway-crossings/feed/ 0
Huge disappointment as council decides not to go ahead with London road scheme https://www.g-bug.org/huge-disappointment-as-council-decides-not-to-go-ahead-with-london-road-scheme/?utm_source=rss&utm_medium=rss&utm_campaign=huge-disappointment-as-council-decides-not-to-go-ahead-with-london-road-scheme https://www.g-bug.org/huge-disappointment-as-council-decides-not-to-go-ahead-with-london-road-scheme/#respond Wed, 30 Oct 2024 22:07:49 +0000 https://www.g-bug.org/?p=2599 GBUG are incredibly disappointment that Surrey County Council voted not to go ahead with stage 1 of the London Road Active Travel Scheme. GBUG spoke at the council decision meeting, and have supported the scheme throughout. The scheme would have increased safety for all pedestrians and cyclists along this route.

The post Huge disappointment as council decides not to go ahead with London road scheme first appeared on GBUG Guildford Bike User Group.

]]>
GBUG are incredibly disappointment that Surrey County Council voted not to go ahead with stage 1 of the London Road Active Travel Scheme. GBUG spoke at the council decision meeting, and have supported the scheme throughout. The scheme would have increased safety for all pedestrians and cyclists along this route.

The post Huge disappointment as council decides not to go ahead with London road scheme first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/huge-disappointment-as-council-decides-not-to-go-ahead-with-london-road-scheme/feed/ 0
London Road Scheme: We need your help! https://www.g-bug.org/london-road-scheme-we-need-your-help/?utm_source=rss&utm_medium=rss&utm_campaign=london-road-scheme-we-need-your-help https://www.g-bug.org/london-road-scheme-we-need-your-help/#comments Mon, 30 Sep 2024 11:20:43 +0000 https://www.g-bug.org/?p=2522 Stage 1 of the London Road Active Travel Scheme runs from Boxgrove Roundabout to Aldi and includes: Please support this scheme by by emailing all Surrey County Council cabinet members* before the middle of October. Please add one or two sentences as to why this is important for you and your family. Be sure to…

The post London Road Scheme: We need your help! first appeared on GBUG Guildford Bike User Group.

]]>

Stage 1 of the London Road Active Travel Scheme runs from Boxgrove Roundabout to Aldi and includes:

  • Safer cycle paths segregated from road traffic up at pavement level.
  • Creating new crossing points
  • Upgrading bus stops

Please support this scheme by by emailing all Surrey County Council cabinet members* before the middle of October. Please add one or two sentences as to why this is important for you and your family. Be sure to add your home address to the email. The cabinet will make a decision on stage 1 of the scheme on 29th October 2024. Without your support this scheme will not go ahead.

For further information see our London Road Active Travel Scheme page.

*If opening on a PC, the email may be placed in your drafts folder.

Existing cycling provision along London road is just a painted dotted white line making a narrow cycle lane. Some cars are driving in the cycle lane.
London Road

The post London Road Scheme: We need your help! first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/london-road-scheme-we-need-your-help/feed/ 1
Pedestrian and Cycle Crossings: We need your help! https://www.g-bug.org/pedestrian-and-cycle-crossings-we-need-your-help/?utm_source=rss&utm_medium=rss&utm_campaign=pedestrian-and-cycle-crossings-we-need-your-help https://www.g-bug.org/pedestrian-and-cycle-crossings-we-need-your-help/#respond Mon, 30 Sep 2024 09:42:00 +0000 https://www.g-bug.org/?p=2528 Have you ever waited at a pedestrian or cycle crossing and wondered why it takes so long for the green person or cyclist to appear? And why road users wait less time? GBUG are currently campaigning to improve pedestrian and cycle crossing timings in Guildford. Please sign our petition. For more information on why this is important…

The post Pedestrian and Cycle Crossings: We need your help! first appeared on GBUG Guildford Bike User Group.

]]>

Have you ever waited at a pedestrian or cycle crossing and wondered why it takes so long for the green person or cyclist to appear? And why road users wait less time?

GBUG are currently campaigning to improve pedestrian and cycle crossing timings in Guildford. Please sign our petition.

A busy pedestrian crossing

For more information on why this is important and what can be done, please visit our Pedestrian and Cycle Crossing Timings page.

The post Pedestrian and Cycle Crossings: We need your help! first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/pedestrian-and-cycle-crossings-we-need-your-help/feed/ 0
Beryl e-bike hubs are popping up around town https://www.g-bug.org/beryl-e-bike-hubs-are-popping-up-around-town/?utm_source=rss&utm_medium=rss&utm_campaign=beryl-e-bike-hubs-are-popping-up-around-town https://www.g-bug.org/beryl-e-bike-hubs-are-popping-up-around-town/#respond Tue, 24 Sep 2024 18:41:20 +0000 https://www.g-bug.org/?p=2469 Beryl e-bike hubs have started being installed around Guildford. Here is one outside the library! Hubs will be installed from Jacobs Well to Shalford over the next few months. Charges are 16p/minute plus £1 to unlock the bike. (Bundles of minutes are available more cheaply). Users who leave bikes outside the painted bays will receive…

The post Beryl e-bike hubs are popping up around town first appeared on GBUG Guildford Bike User Group.

]]>

Beryl e-bike hubs have started being installed around Guildford. Here is one outside the library! Hubs will be installed from Jacobs Well to Shalford over the next few months. Charges are 16p/minute plus £1 to unlock the bike. (Bundles of minutes are available more cheaply). Users who leave bikes outside the painted bays will receive a fine.

We at GBUG are very excited about this exciting scheme but Guildford needs better cycling infrastructure for the scheme to reach its full potential. To help GBUG campaign for safe cycling infrastructure, join our mailing list or email info@g-bug.org.

See https://beryl.cc/scheme/guildford for further details about hiring the bikes, and GBUG’s page about the campaign.

The post Beryl e-bike hubs are popping up around town first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/beryl-e-bike-hubs-are-popping-up-around-town/feed/ 0
A25 improvements are underway https://www.g-bug.org/a25-improvements-are-underway/?utm_source=rss&utm_medium=rss&utm_campaign=a25-improvements-are-underway https://www.g-bug.org/a25-improvements-are-underway/#respond Tue, 24 Sep 2024 18:26:59 +0000 https://www.g-bug.org/?p=2464 Improvements have started to the north side of the A25 Ladymead include widening the footway and introducing signalised toucan crossing facilities over the vehicle entrance/exit to Ladymead Retail Centre. This will overcome the gap in the existing shared pedestrian and cycling route along the A25. GBUG have further information on this package of improvements.

The post A25 improvements are underway first appeared on GBUG Guildford Bike User Group.

]]>
Roadworks along footway/cycleway of A25

Improvements have started to the north side of the A25 Ladymead include widening the footway and introducing signalised toucan crossing facilities over the vehicle entrance/exit to Ladymead Retail Centre. This will overcome the gap in the existing shared pedestrian and cycling route along the A25.

GBUG have further information on this package of improvements.

The post A25 improvements are underway first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/a25-improvements-are-underway/feed/ 0
Help campaign for safer cycling for children – Join Kidical’s next ride on Sunday 29th September 2pm https://www.g-bug.org/help-campaign-for-safer-cycling-for-children-join-kidicals-next-ride-on-sunday-29th-september-2pm/?utm_source=rss&utm_medium=rss&utm_campaign=help-campaign-for-safer-cycling-for-children-join-kidicals-next-ride-on-sunday-29th-september-2pm https://www.g-bug.org/help-campaign-for-safer-cycling-for-children-join-kidicals-next-ride-on-sunday-29th-september-2pm/#respond Fri, 06 Sep 2024 09:31:57 +0000 https://www.g-bug.org/?p=2456 Kidical’s next ride is in Guildford on Sunday 29th September at 2pm. For more information see our Events page.

The post Help campaign for safer cycling for children – Join Kidical’s next ride on Sunday 29th September 2pm first appeared on GBUG Guildford Bike User Group.

]]>
Kidical’s next ride is in Guildford on Sunday 29th September at 2pm. For more information see our Events page.

The post Help campaign for safer cycling for children – Join Kidical’s next ride on Sunday 29th September 2pm first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/help-campaign-for-safer-cycling-for-children-join-kidicals-next-ride-on-sunday-29th-september-2pm/feed/ 0
Funding announced for the Guildford to Godalming Greenway https://www.g-bug.org/funding-announced-for-the-guildford-to-godalming-greenway/?utm_source=rss&utm_medium=rss&utm_campaign=funding-announced-for-the-guildford-to-godalming-greenway https://www.g-bug.org/funding-announced-for-the-guildford-to-godalming-greenway/#respond Mon, 26 Aug 2024 08:17:22 +0000 https://www.g-bug.org/?p=2437 GBUG are delighted that phase 1 of the Guildford to Godalming Greenway has been awarded funding! The Godalming Cycle Campaign came up with the idea to provide a surfaced, all-weather cycle route between the two towns. GBUG joined with Godalming Cycle Campaign to push the idea forward with Guildford Borough Council. Construction is due to commence from 2025.

The post Funding announced for the Guildford to Godalming Greenway first appeared on GBUG Guildford Bike User Group.

]]>
GBUG are delighted that phase 1 of the Guildford to Godalming Greenway has been awarded funding! The Godalming Cycle Campaign came up with the idea to provide a surfaced, all-weather cycle route between the two towns. GBUG joined with Godalming Cycle Campaign to push the idea forward with Guildford Borough Council. Construction is due to commence from 2025.

The post Funding announced for the Guildford to Godalming Greenway first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/funding-announced-for-the-guildford-to-godalming-greenway/feed/ 0
Guildford’s long awaited LCWIP https://www.g-bug.org/guildfords-long-awaited-lcwip/?utm_source=rss&utm_medium=rss&utm_campaign=guildfords-long-awaited-lcwip https://www.g-bug.org/guildfords-long-awaited-lcwip/#respond Sat, 24 Aug 2024 12:07:04 +0000 https://www.g-bug.org/?p=2425 Guildford’s Local Cycling and Walking Infrastructure Plan (LCWIP) was endorsed by the council on 8th August. See our LCWIP page for a summary of the new cycle routes that have been given the highest priority for implementation.

The post Guildford’s long awaited LCWIP first appeared on GBUG Guildford Bike User Group.

]]>
Guildford’s Local Cycling and Walking Infrastructure Plan (LCWIP) was endorsed by the council on 8th August. See our LCWIP page for a summary of the new cycle routes that have been given the highest priority for implementation.

The post Guildford’s long awaited LCWIP first appeared on GBUG Guildford Bike User Group.

]]>
https://www.g-bug.org/guildfords-long-awaited-lcwip/feed/ 0