The Dagley Lane resurfacing of the Bridleway is complete with funding obtained as part of the EATF Tranche 2. The surface is a bound, all-weather surface to allow all-weather cycling between Shalford and Guildford without using the main road. The path between the bridleway and Shalford Thames Water Depot will be upgraded soon.